The Bloomberg Terminal for Project Siting and Interconnection Risk Assessment

Developed by leading power systems engineers in the country, not just software developers.

Twenty-five years of bankable nodal price curves with basis for every substation and transmission line in the country, grid power injection and withdrawal headroom, and curtailment risk — resolved to the individual bus, for every node on the system.

Learn more
Bankable data for every type of projectSolar PV, Wind, Large Loads and Data Centers, BESS, Gas-Fired Generation, and everything in between.
Every data attributethat you need to develop a bankable and financeable grid-connected project.

Screening card for one real bus, Coopers Mills 345 kV (ISO-NE bus 100005, Kennebec County, Maine): injection and withdrawal headroom for each study, the 2028 forecast median nodal price, solar curtailment at 100 MW, the mean absolute basis in 2025 and the annual average nodal price from 2020 to 2026 year-to-date.

Scroll
The data behind every node
  • Planning power-flow cases
  • N-1 contingency sets
  • Interconnection queues
  • Approved transmission upgrades
  • Generator retirements
  • Short-circuit strength
  • Load & large-load forecasts
  • Delivered fuel-price forecasts
  • Interface & transfer limits
  • Historical nodal LMPs
  • Hub & zone prices
  • Generator & load inventories
  • Transmission line GIS
0US ISOs / RTOs, plus balancing authorities
0year forecast horizon
0+mapped substations above 40 kV
0%public-source traceable
The Platform

From ISO planning data to a ranked site shortlist.

Screening built on actual power-flow cases and bankable SCED analysis, not spreadsheet heuristics. Every capability resolves down to the individual bus.

25-year bankable price curves

Nodal LMP forecasting for every substation and line on the US grid

Historical, forecast, and the full distribution — P5 / P25 / median / P75 / P95, peak vs off-peak, hours above $200 and below $0 — for every node on the system. Based on a full hourly SCED analysis.

Top-bottom (TB) attributes for short- and long-duration BESS.

  • TB2 / TB4 / TB6 / TB8 — the average daily gap between the top and bottom 2, 4, 6 and 8 hours.
  • Basis to every hub and zone, plus the loss and congestion components of price.
  • Business-as-usual and High-Load cases, with post-2035 divergence flagged.
Bankable Future Price Curves

Curtailment and risk screening

Quantify curtailment exposure for solar PV, wind, battery storage, data center, and other large loads — resolved by voltage tier and project capacity — so you know where output gets clipped before you commit.

  • Screened at 100, 250 and 500 MW, matched to what each voltage tier can realistically host.
  • Battery opportunity loss and large-load reliability risk alongside solar and wind curtailment.
  • Read straight off the hourly dispatch, not an annual average.
Full Nodal Curtailment & Congestion Analysis

Interconnection capacity analysis

Injection and withdrawal grid capacity across Shoulder, Summer Peak, Winter Peak with full NRIS / ERIS scenarios, against a required-capacity target line — find the MW where grid upgrades become an interconnection risk.

  • The limiting element behind every figure — monitored facility, triggering outage and loading.
  • Estimated upgrade cost for each overloaded element, and pre-existing overloads flagged.
  • Large-load and data-center withdrawal studies alongside generation and BESS.
Generation & Data Center Interconnection Capacity

Congestion, basis & capture

Basis to every zone in the ISO or RTO, renewable capture ratio, and the top binding constraints per node — the difference between a headline LMP and the price a project actually realizes.

  • Congestion share and loss factor — how much of the price is location, not energy.
  • Top binding constraint per node, with binding hours per year and shadow price.
  • Solar and wind capture ratios through the forecast horizon.
Price Discovery

Interactive grid map

Substations, T&D lines, generators, loads, transformers, the interconnection queue, retirements, and approved upgrades — filter by voltage and county, and overlay heatmaps. Everything you need visually on a GIS platform, perfectly married with the physics of the electrical grid.

  • Several ISOs on one map, with headroom and price heatmaps per scenario.
  • Click any bus or line for its full Grid Capacity and Economic profile.
  • Measure distances, radii and areas directly on the map.

Nodal Dashboard — compare up to 5 projects

Line up to five candidate POIs side by side across power-flow results and Economic dimensions on a consistent, dispatch-based footing. Technology fit at the same node, compared apples to apples.

  • Substations and transmission lines in the same comparison.
  • A constraint table listing every limiting element behind the numbers.
  • Export everything on screen to Excel.
Nodal Dashboard
Impact

The platform is new. The data behind it isn't.

GridSense is built by Continuum Associates, the power-system engineering firm that has run interconnection, transmission-planning and market-efficiency studies for utilities, ISOs / RTOs and developers since 2011.

15+GWof generator interconnection studies, renewable and conventional
200+years of combined, direct power-industry experience
25countries worked in, across the Americas, Asia and Africa
16US states, spanning 7 ISO / RTO footprints
Track record · across our 9 published case studies$1.4B+

of transmission and distribution investment planned, managed or delivered by our engineers.

  • FERC 1000Competitive transmission solutions that ranked high in ISO evaluations, one selected for implementation.
  • 10-yearTransmission master planning for a T&D utility, built to NERC reliability standards.
  • 2 ISOsReal-time, sub-second grid visibility from a phasor measurement (PMU) program.
Solutions

Six ways to de‑risk a project before you commit.

Five are live today and one is in build. All of them run on the same study data and resolve to the individual bus and line.

Who It's For

Built for teams making the siting calls and interconnection decisions.

Energy developers, IPPs, storage and data-center teams, and the counterparties underwriting them.

Screening

Find the best node first

Rank candidates by forecast energy value, basis to zone and congestion exposure — before interconnection spend.

Sizing

Size to the grid

Quantify injection headroom and the exact MW at which curtailment risk becomes material, by voltage tier.

Technology

Solar vs wind vs storage vs data centers

Compare technologies, hybrids and data-center load on a consistent, dispatch-based footing at the same node.

Diligence

Underwrite the downside

Stress against a High-Load sensitivity and post-2035 divergence — the framing counterparties expect.

Roadmap

What lands next.

Ten features in active build for the next release — deeper site context, configurable analytics, and the controls teams asked for.

On the roadmap

Phase 2

01Site context & data layers

Land ownership & parcels

Parcel detail and slope, compared at bus level — screen buildability alongside grid capacity.

02Site context & data layers

Fiber, gas pipelines & water

Co-located infrastructure availability, for data-center and hybrid siting.

03Site context & data layers

Custom KML / GeoJSON import

Bring your own layers — leases, service territories, prospect lists — onto the grid map.

04Site context & data layers

Drop-Off Analysis Tool (DAT)

DFAX-based offline calculation, so you can run a drop-off without a TARA license.

05Analytics

Graph configurator

Any chart, any data, any bus — build the view your team works from instead of the one we shipped.

06Analytics

Dynamic heatmaps

Heatmap any column under any scenario, live on the map.

07Analytics

Ranking & scoring

Rank candidate nodes against your own required MW, not a generic index.

08Analytics

Fuel-type analytics

Scenario fit and KPIs cut by technology — solar, wind, storage, load.

09Platform & controls

System auditing & export

Download any dashboard, with activity logging behind it for the audit trail.

10Platform & controls

Org & user preferences

Saved defaults per organization and per user — your filters, scenarios and layouts persist.

Book a Demo

Screen your next node before your competitors screen theirs.

Bring a shortlist of candidate sites — we'll walk you through their 25-year price curves, headroom and curtailment risk live, on any ISO or Balancing Authority of your choice.

FAQ

Frequently asked questions.

What developers and their counterparties ask us most in demos.

LoginHow do I get access and log in?

GridSense accounts are set up for your organization by our team, so there is no public sign-up. Once your subscription is active, each user receives an email invitation with their sign-in details for gridsense.energy.

SubscriptionWhat subscription plans are available?

Plans are set per organization: Grid Capacity (headroom and constraints), Economic (price curves, basis and curtailment), Full Dataset (both, plus downloads), and Full + Advanced Analytics. You can move between plans at any time, and the change applies to your whole team within minutes.

Data sourcesWhere does the data come from?

From each ISO's and RTO's own planning inputs: power-flow planning cases and contingency lists, interconnection queues, load forecasts, approved transmission upgrades, generator retirements, fuel-price forecasts and interface limits. Every assumption traces back to a public, dated source, and our engineers run the power-flow and SCED studies in-house.

Interconnection capacityHow is injection and withdrawal headroom calculated?

We inject or withdraw power at each point of interconnection in 1 MW steps, under normal and single-contingency (N-1) conditions, until the first thermal overload — following the ISO's own interconnection study criteria. Each result names the limiting element, the outage that triggers it and an estimated upgrade cost, with pre-existing overloads flagged separately.

Price curvesHow are the price curves built, and are they bankable?

Each curve comes from a full hourly security-constrained economic dispatch of the ISO on anchor years 2028, 2035, 2040, 2045 and 2050, with the years in between projected from those solutions. Inputs are documented in an assumption book per ISO, so lenders and counterparties can trace every driver of the forecast.

Nodal DashboardWhat can I do in the Nodal Dashboard?

Compare up to five candidate nodes — substations or transmission lines — side by side across Power Flow and Economic charts, with a constraint table listing every limiting element behind the numbers. Everything on screen exports to Excel.

UpdatesHow often is the data updated?

Power-flow studies are refreshed as queues and transmission plans change — we aim for twice a year — and price curves are re-run as ISOs publish new planning inputs. Every release is versioned, so you always know which study a number came from.

Book a Demo

Tell us about your project.

We'll tailor a live walkthrough on any ISO or balancing authority of your choice, focused on the nodes and technologies you care about.